New Sunnybank Homeowners Water Reservoir
SERVICES: Civil Engineering | LOCATION: Chelan County | CLIENT SECTORS: Commercial & Industrial
![title-decoration title-decoration](https://erlandsen.com.s60471.gridserver.com/wp-content/uploads/2016/08/title-decoration.png)
We conducted an engineering report for the development of a new water reservoir for the Sunnybank Homeowners Water Association located on Lake Chelan. The project developed construction plans for a new reservoir.
Work included evaluating the following system parameters:
- 58-connection water system, including peak hour demand
- Fire suppression storage & standby storage, as well as equalizing and operational volumes
- Overflow restrictions and piping capacity limits
- Design and construction management/inspection services
- Topographic mapping and construction staking
![sunnybank-reservoir-photo-4 sunnybank-reservoir-photo-4](https://erlandsen.com.s60471.gridserver.com/wp-content/uploads/2016/09/Sunnybank-Reservoir-Photo-4.jpg)
![sunnybank-reservoir-photo-3 sunnybank-reservoir-photo-3](https://erlandsen.com.s60471.gridserver.com/wp-content/uploads/2016/09/Sunnybank-Reservoir-Photo-3.jpg)
![sunnybank-reservoir-photo-2 sunnybank-reservoir-photo-2](https://erlandsen.com.s60471.gridserver.com/wp-content/uploads/2016/09/Sunnybank-Reservoir-Photo-2.jpg)
![sunnybank-reservoir-photo-1 sunnybank-reservoir-photo-1](https://erlandsen.com.s60471.gridserver.com/wp-content/uploads/2016/09/Sunnybank-Reservoir-Photo-1.jpg)