Eastmont High School Survey and Design Support

SERVICESCivil Engineering | Land Surveying | LOCATION: East Wenatchee | CLIENT SECTORS: Engineers & Architects / Schools

title-decoration

Erlandsen provided survey and design support on the $30 million facility upgrade to Eastmont High School. Erlandsen was responsible for:

  • A site survey – completed a comprehensive topographic survey including all underground utilities.
  • Comprehensive planning – provided alternative development for the facility, which included analyzing various access alternatives, playground options, site trails, and improvements to ADA access elements.
  • Site design – developed construction plans for redesigned parking lots that improve access (and ADA access) for students and faculty.
  • Improvements for 3rd & 5th streets, which included new pathways that meet ADA requirements and sidewalk replacements to eliminate trip hazards.
  • Storm drainage that meet City of East Wenatchee requirements.
  • Site utilities – utility extensions for upgrades to the fire system, domestic water supply, power, fiber optic systems and communication systems.
  • Survey control
  • Topographic survey, surfacing and modeling/mapping
  • Construction staking