Geneva Substation Site Design
SERVICES: Civil Engineering | LOCATION: Mattawa | CLIENT SECTORS: Dams & PUDs We completed a site design for the Geneva Substation in Mattawa, WA, for the Grant County PUD. The design elements included: Completed a topographic survey for the site. Developed a boundary for the site Mass grading of the site to meet an existing roadway connection. Provides…
Read MoreGagnon Property Fish Habitat Improvements
SERVICES: Land Surveying | LOCATION: Chelan County | CLIENT SECTORS: Commercial & Industrial We provided survey services for proposed fish rearing and habitat improvements along the Wenatchee River. Work included: Establishing horizontal and vertical control over a five-mile reach of the Wenatchee River Cross sectioning of the upland and river bed at 50 locations within the reach Surface modeling…
Read MoreEastmont–Hanna- Valhalla 115kV Transmission Line
SERVICES: Land Surveying | LOCATION: East Wenatchee | CLIENT SECTORS: Dams & PUDs We provided survey services to the Douglas PUD on the Eastmont-Hanna-Valhalla 115kV Transmission line project. Our work included: As-built for nine miles of existing transmission line components Determination and monumentation of easement centerline and limits Preparation and recording of a Record of Survey
Read MoreDune Lake Substation
SERVICES: Land Surveying | LOCATION: Grant County | CLIENT SECTORS: Dams & PUDs We provided an as-built survey of the location of the transmission line, conductors, insulators, and towers at the Dune Lake Substation for the Grant County PUD. This project consisted of several tasks, including determining the location of the transmission line wires, their connection points at…
Read MoreColumbia Ridge Substation Surveys
SERVICES: Land Surveying | LOCATION: Grant County | CLIENT SECTORS: Dams & PUDs For this project, we performed boundary and topographic surveys and prepared the Grant County PUD’s standard preliminary plan and profile, Record of Survey, boundary descriptions and exhibit maps for property acquisitions.
Read MoreChief Joseph Fish Hatchery
SERVICES: Land Surveying | LOCATION: Bridgeport | CLIENT SECTORS: Dams & PUDs We provided pre-design topographic mapping, boundary determination, legal easement, and exhibit preparation in conjunction with the $40 million Chief Joseph Fish Hatchery project. Our work included: Preparation of easement descriptions and exhibits in support of hatchery design and development Planning, design and construction Initial boundary and…
Read MoreChelan Falls Rearing Facility Improvements
SERVICES: Land Surveying | LOCATION: Chelan Falls | CLIENT SECTORS: Dams & PUDs We provided survey services associated with a proposed fish rearing facility located along the lower quarter mile of the Chelan River adjoining the Chelan Dam electrical powerhouse. The work included the following: Control, topographic and bathymetric surveys Surface modeling of the Chelan river bed and…
Read MoreRunway 30 Expansion & Improvements – Pangborn Memorial Airport
SERVICES: Land Surveying | LOCATION: East Wenatchee | CLIENT SECTORS: Airports & Ports We provided survey services associated with the Runway 30 Expansion and Taxiways A & B improvements at Pangborn Memorial Airport in East Wenatchee, WA. The work included: Localizer/Threshold relation survey and mapping for the FAA and FAR Zone obstruction survey and mapping. Establishment of project control…
Read MoreRunway 9/27 Improvements – Quincy Airport
SERVICES: Land Surveying | LOCATION: Quincy | CLIENT SECTORS: Airports & Ports / Engineers & Architects We provided survey services to Engineers on the Quincy Airport project. The work included: Surveying and locating runway centerline end point monuments Establishing project control points Planning, reducing, processing, analyzing, and drafting survey control data Performing topographic surveys and surface modeling adequate to generate…
Read MoreEphrata Airport Improvements
SERVICES: Land Surveying | LOCATION: Ephrata | CLIENT SECTORS: Airports & Ports / Engineers & Architects We provided survey services to Engineers on the Ephrata Airport project. The work included establishing primary survey control, project baseline and a complete topographic survey of 60 acres for taxiway A-2 and B reconstruction. The primary project control points were derived by static…